Construction Support Services for the construction of a new four lane (two lanes each direction) road from Kapolei Parkway to Farrington Highway. Roadwork included the installation of PCC pavement, AC pavement, drilled shafts, a segmental retaining wall, medians, curbs and gutters, sidewalks, a drainage system, BWS water system, sanitary sewer system, traffic signal system, and roadway lighting system.